Case Study: Hanham Road, Taupaki

View PDF

Working to a tight deadline, as client needed the kitchen complete by the week before Christmas. Liaising and working with other trades on site that were not contracted by BML, to ensure that all pre-installation work was completed on time.

BML worked with the client to ensure that the final creation was exactly what she had imagined. Many changes were made a long the way including a last minute change after manufacturing had commenced, to reposition the double door fridge allowing more door opening space

The kitchen was completed on time to an exceptionally high standard. Any issues were overcome due to the client and BML working together. As a result of the work done the client asked BML to create an elaborate entertainment unit.

The client commented that "the kitchen works really well! BML let me change my mind a lot. They never made me feel difficult. It was a pleasure to be around their builder/installer he was a very friendly, outgoing guy who worked well with all the other tradespeople on site. Nothing was a problem" <